Spool Information
APEX Spool Tracker
MAN-5-035
In Production
Production Run BUILDING1 1-63
Workflow / Size 6IN / Not specified
Current Location Document
Spool Information

MAN-5-035

In Production Document

After Fabrication — Testing

No Testing Batch assigned.

After Fabrication — Dry & Cap

Dry & Cap Status
Awaiting Dry & Cap
Ready to Ship
No

Remove Accidental Spool

This spool has history and cannot be deleted. Void it to preserve traceability and remove it from active production.

Spool Identity / Production Summary

Current read-only production record.
MAN-5-035
Production Workflow
6-Inch Production (6IN)
Production Run
BUILDING1 1-63
Status
In Production
Current Station
Document
Current Location
Document
Job
ISO
Drawing
Pipe Size
Material
Active
Yes
Last Updated
9/22/2026, 10:03:54 AM

Material Traceability

Approved heat numbers assigned to this spool.

Main / Header Pipe Heat

  • Y251103G08C-2

Nozzle Heat (1" Nozzles)

No Nozzle Heat Assigned

WELDING TRACEABILITY

ROTOWELD

Rotoweld — 9/1/2026, 12:25:10 PM

Welder information missing

NOZZLE WELDING

Nozzle Welding — 9/19/2026, 7:10:50 PM
  • 129 — Rodrigo Guzman
  • 120 — Vincent Estrada

FINAL QC

Markings Removed: NOT COMPLETE
Tag Attached: NOT COMPLETE
Document Completed: No

Production History

9/22/2026, 10:03:54 AM
In Production
Document
9/21/2026, 7:43:54 AM
In Production
Flanging
9/19/2026, 7:10:50 PM
In Production
Drill
9/18/2026, 10:54:52 AM
In Production
Nozzle Welding
9/1/2026, 12:25:10 PM
In Production
Nozzle Fit-Up
9/1/2026, 10:54:00 AM
In Production
Rotoweld
9/1/2026, 7:55:20 AM
In Production
Fit-Up
8/18/2026, 12:55:06 PM
Loaded
No location

Audit / QA History

DateOperatorStatusLocationNotes
9/22/2026, 10:03:54 AM Kiosk: Flanging In Production to In Production Flanging to Document Production handoff Flanging to Document
9/21/2026, 7:43:54 AM Kiosk: Drill In Production to In Production Drill to Flanging Production handoff Drill to Flanging
9/19/2026, 7:10:50 PM Kiosk: Nozzle Welding In Production to In Production Nozzle Welding to Drill Production handoff Nozzle Welding to Drill
9/18/2026, 10:54:52 AM Kiosk: Nozzle Fit-Up In Production to In Production Nozzle Fit-Up to Nozzle Welding Production handoff Nozzle Fit-Up to Nozzle Welding
9/1/2026, 12:25:10 PM Kiosk: Rotoweld In Production to In Production Rotoweld to Nozzle Fit-Up Production handoff Rotoweld to Nozzle Fit-Up
9/1/2026, 10:54:00 AM Kiosk: Fit-Up In Production to In Production Fit-Up to Rotoweld Production handoff Fit-Up to Rotoweld
9/1/2026, 7:55:20 AM Release Spool Loaded to In Production to Fit-Up Release Spool to Fit-Up
9/1/2026, 7:55:20 AM Release Spool Loaded to Loaded to Material Traceability: added PRIMARY_MATERIAL heat Y251103G08C-2 to spool MAN-5-035.

Production Run Reassignment History

No run reassignment history.