Spool Information
APEX Spool Tracker
MAN-5-048
Fabrication Complete
Production Run BUILDING1 1-63
Workflow / Size 6IN / Not specified
Current Location Document Complete
Fabrication Completed 9/23/2026, 1:53:42 PM
Spool Information

MAN-5-048

Fabrication Complete Document Complete

After Fabrication — Testing

No Testing Batch assigned.

After Fabrication — Dry & Cap

Dry & Cap Status
Awaiting Dry & Cap
Ready to Ship
No

Remove Accidental Spool

This spool has history and cannot be deleted. Void it to preserve traceability and remove it from active production.

Spool Identity / Production Summary

Current read-only production record.
MAN-5-048
Production Workflow
6-Inch Production (6IN)
Production Run
BUILDING1 1-63
Status
Fabrication Complete
Current Station
Not released to production
Current Location
Document Complete
Job
ISO
Drawing
Pipe Size
Material
Active
Yes
Last Updated
9/23/2026, 1:53:42 PM

Material Traceability

Approved heat numbers assigned to this spool.

Main / Header Pipe Heat

  • Y251103F04C-6

Nozzle Heat (1" Nozzles)

  • OC551404

WELDING TRACEABILITY

ROTOWELD

Rotoweld — 9/10/2026, 12:13:01 PM
  • R — Rich Fiorvanti

NOZZLE WELDING

Nozzle Welding — 9/22/2026, 9:07:02 AM
  • 129 — Rodrigo Guzman
  • 120 — Vincent Estrada

FINAL QC

Markings Removed: COMPLETE
Tag Attached: COMPLETE
Document Completed: Yes — 9/23/2026, 1:53:42 PM

Production History

9/23/2026, 1:53:42 PM
Fabrication Complete
Document Complete
9/22/2026, 11:12:24 AM
In Production
Document
9/22/2026, 9:57:46 AM
In Production
Flanging
9/22/2026, 9:07:02 AM
In Production
Drill
9/15/2026, 4:11:53 PM
In Production
Nozzle Welding
9/10/2026, 12:13:02 PM
In Production
Nozzle Fit-Up
9/10/2026, 12:08:02 PM
In Production
Rotoweld
9/10/2026, 12:07:13 PM
In Production
Fit-Up
8/18/2026, 12:55:06 PM
Loaded
No location

Audit / QA History

DateOperatorStatusLocationNotes
9/23/2026, 1:53:42 PM Kiosk: Document In Production to Fabrication Complete Document to Document Complete Terminal production completion at Document
9/23/2026, 1:53:42 PM Document QC In Production to In Production Document to Document Material Traceability: added NOZZLE heat OC551404 to spool MAN-5-048.
9/22/2026, 11:12:24 AM Kiosk: Flanging In Production to In Production Flanging to Document Production handoff Flanging to Document
9/22/2026, 9:57:46 AM Kiosk: Drill In Production to In Production Drill to Flanging Production handoff Drill to Flanging
9/22/2026, 9:07:02 AM Kiosk: Nozzle Welding In Production to In Production Nozzle Welding to Drill Production handoff Nozzle Welding to Drill
9/15/2026, 4:11:53 PM Kiosk: Nozzle Fit-Up In Production to In Production Nozzle Fit-Up to Nozzle Welding Production handoff Nozzle Fit-Up to Nozzle Welding
9/10/2026, 12:13:02 PM Kiosk: Rotoweld In Production to In Production Rotoweld to Nozzle Fit-Up Production handoff Rotoweld to Nozzle Fit-Up
9/10/2026, 12:08:02 PM Kiosk: Fit-Up In Production to In Production Fit-Up to Rotoweld Production handoff Fit-Up to Rotoweld
9/10/2026, 12:07:13 PM Release Spool Loaded to In Production to Fit-Up Release Spool to Fit-Up